Despite the epic gas leak at work today that forced us to evacuate for hours and get behind, everything on the home front is right on schedule. I took advantage of the evacuation (time is money ya'll) to go and sign the paperwork on the sale of my condo. I am now the proud owner of only ONE property in the Salt Lake Valley. And what a lovely property it is becoming. At 8:30am this morning, the kitchen cabinets were delivered. Had I known that I would have been standing on the side of the road once I got to work, I would have stuck around the house.
|
empty kitchen, but not for long! |
By the time I was able to return to work, Michael sent me some progress pictures of the kitchen:
|
smile for the blog sir |
If I didn't have a call with my Philippines team at the end of the day, I would definitely be on my way home instead of sitting at work with a headache. Gas leak? I am also anxious to see the progress on the exterior paint. They were just getting started when I left this morning.
The guys did such a great job on the interior. I can't wait to see how it looks on the outside.
|
solid pocket door + my closet painted |
|
mostly painted master, waiting on windows to finish |
|
black interior doors for upstairs |
For those of you wondering if the gas leak has gone to my head, thus resulting in a decision to paint my doors black, check out these inspiration photos:
That's all for now. Stay tuned!
No comments:
Post a Comment