It was about 5 hectic hours where things felt out of control. About 1/3 of the furniture went into the apartment while the rest of it is stored in two bedrooms downstairs.
Before dinner, the apartment started looking livable. All the workers left and things almost felt normal.
We even had the opportunity to enjoy a few design updates including the finished apartment bathroom and a halfway done apartment kitchen.
Did you notice a missing back splash and counter? We are waiting on the second slab. It should go in this week along with new floors. Cabinet hardware is on a two week back order. Sad face. |
Other exciting design choices that have been made this weekend include ordering the fabric for the main floor living room couches. I narrowed it down to five aqua/jade fabrics and I ended up going with an antiqued velvet. It looked great with the paint color that will be upstairs and wood sample that will be similar to the floors.
Choose the one in the foreground |
Selection on left. Cheetah swatch is for the custom bed we are having made. |